Plans & request quote

Choose a software offer for your institution

Start with MissionLab School Pilot, University Digital Twin Lab or Professional Digital Twin Evaluation. KidSAT is a separately scoped hardware extension. Quotes reflect audience, duration, support and any hardware or delivery requirements; there is no fixed software price on this page.

Schools and STEM programmes

MissionLab School Pilot

A software-first pilot for a selected grade, teaching objective and bounded mission sequence.

  • Teacher preparation and onboarding
  • Open Practice or scoped Managed School
  • Learner mission evidence
  • Teacher-owned review and pilot support

Continuing Institutional MissionLab delivery can follow a pilot for multiple classes or grade levels; scope and support are agreed with the school.

Read offer details

University faculty and laboratories

University Digital Twin Lab

A guided evaluation of current ML-D missions and the University Digital Twin Lab workflow.

  • Public Lab and University 3U Mission Control
  • Model identity, provenance and comparison
  • Evidence and V&V reasoning
  • Faculty-owned course mapping and assessment

Read offer details

Engineering teams and research laboratories

Professional Digital Twin Evaluation

A bounded engineering evaluation using curated approved models, scenarios and workbenches.

  • Deterministic public software examples
  • Current subsystem workbenches
  • Comparison, replay and evidence where supported
  • Documented model maturity and limitations

Read offer details

Separately scoped · optional hardware

KidSAT Hardware Extension

Add a supervised one-axis physical trainer only when the site, trained operator, safety, setup and commissioning scope are agreed. No KidSAT kit is needed to complete School, University or Professional software work. Measured twin-to-hardware claims require separate accepted commissioning and correlation.

What a quote does not authorize

An education identity, subscription or quotation never activates physical hardware, operator control, official Challenge attempts or production deployment. Hardware acceptance, official competition and deployment remain separate human gates.